Because panels and inverters are imported and USD-linked, pricing tracks the exchange rate a quote from three months ago is rarely valid today. Beyond currency, three site factors move it most.
| Package | Price (from) | Best for |
|---|---|---|
| 20KW on-grid | On request | Daytime business, net metering |
| 20KW hybrid | On request | No-interruption operations |
Those three factors: roof type (RCC lenter takes standard structure; sheet roofs over kitchens or warehouses need purpose-made rails), cable run length from roof to distribution board, and whether your 3-phase board needs upgrading. Hybrid adds a battery bank sized to your backup priority usually lights, POS and a couple of ACs.
During sun hours a 20KW system carries a typical office or restaurant fit: 8-10 × 1.5-ton inverter ACs with lighting and computers, a commercial kitchen (fridges, freezers, hoods) plus dining ACs with load scheduling at peak, or a retail floor of display chillers, lighting, signage and six ACs.
If your bill sits below ~2,200 units, the 15KW system saves you capital; above ~3,000 units, step up to the 25KW system. Welding or compressor-heavy workshops need a surge assessment first.
At ~4-5 units per kW daily, expect 80-100 units per day roughly 2,400-3,000 a month. Your operating hours overlap generation hours, so most units are consumed the moment they’re made.
| Season | Output band |
|---|---|
| May-Jun | Top of the band |
| Monsoon | Near average, rain cleans |
| Oct-Nov | Strong, stable |
| Nov-Jan (Punjab smog) | 15-25% lower |
Under NEPRA’s 2026 net-billing rules, exported units are credited at the notified rate, below retail. Businesses are the structural winners: a restaurant prepping from 11am, an office running ACs 9-to-6, a shop with chillers all day self-consume 75-90% of generation.
You don’t need the full amount upfront financing is available through solar installments. As one of Meezan Bank’s Top-3 approved solar vendors, Islamic financing is a documented, pre-vetted route rather than a paperwork battle.
Many business owners structure it so the monthly installment sits below the old electricity bill cash-flow positive from month one, with the system fully owned at term end. For multi-site or tariff-specific planning, our commercial team profiles your load rather than guessing.
Get a system sized from your bill
A two-storey restaurant in Johar Town was billing ~Rs 180,000/month in summer: ten 1.5-ton inverter ACs across dining floors, a cold room, kitchen refrigeration and signage. A 20KW on-grid system went onto a mixed roof RCC over dining, sheet over the kitchen, each with its own structure type. Daytime generation now covers prep and lunch service almost entirely; the evening rush still buys from LESCO. Even with smog-season dips, lunch-hour self-consumption keeps payback on the early side of the 2.5-4 year window.
A 20KW system qualifies for net metering on a 3-phase connection, and Zynergy handles the application alongside installation. Under net billing, exported units earn the notified rate while imports cost full retail.
For a daytime business this matters minimally you self-consume most generation, and only the exported remainder earns the lower rate. The structure and cabling can be designed expansion-ready, with 25KW the natural next step if your load grows again.
On-grid and hybrid sit in different brackets. Prices are USD-linked, so always work from a dated quote.
Around 80-100 units daily about 2,400-3,000 per month, higher in summer, lower in smog season.
Roughly 36 × 550W panels on ~1,600 sq ft of unshaded roof.
Yes restaurants, offices, retail and small schools are its core market.
Yes financing including Meezan Bank Islamic financing through Zynergy as an approved Top-3 vendor.
8-10 × 1.5-ton inverter ACs during sun hours, alongside lighting and equipment.
On-grid where load-shedding is rare; hybrid where outages cost you sales. The battery covers critical loads.
Minimally. Daytime businesses self-consume most generation; only the exported remainder earns the lower notified rate.
The structure and cabling can be designed expansion-ready; the natural next step is the 25KW system.
7-15 days from survey to commissioning, with net-metering paperwork handled alongside.
Get a dated, site-specific 20KW price today free survey and design, net-metering handled, installed in 7-15 days with financing available.