Our solar system packages are engineered bundles with nothing missing Tier-1 panels, the right inverter, galvanised structure, protections, net metering, installation and warranty in one transparent price. Sizes run from 1KW homes to 1MW industrial plants, each generating roughly 4-5 units per day per KW, installed in 7-15 days.

1KW-1MW
Package range
4-5
Units/day per KW
7-15 days
To install
2.5-4 yrs
Typical payback

Solar Packages by Size

Size is the first decision, and your electricity bill is the best sizing tool you own: divide monthly units by 30, then by 4-5 (the units each KW produces daily in Pakistan), and you have your KW requirement.

PackageMonthly units coveredTypical home/loadRuns in daytime
3KW350-450Flat / small house, 1 AC used sparinglyFans, fridge, lights, 1 inverter AC (careful use)
5KW600-750Average 5-10 marla home1-2 inverter ACs + full base load
8-10KW1,000-1,500Large home / 1-kanal house2-3 ACs, water pump, kitchen loads
15-20KW1,800-3,000Small office, school, shopMultiple ACs + commercial equipment
50KW-1MWCustomFactory, mill, cold storageDesigned against your load profile

Note how the 1.5-ton inverter AC, the single biggest summer load in most homes, drives the jump from 3KW to 5KW and beyond. If you sit between two sizes, step up rather than down per-watt cost falls as systems grow.

Most Popular Packages: 3KW, 5KW and 10KW

Three sizes cover the overwhelming majority of Pakistani homes. Here's who each one fits.

Entry point
3KW System

Suits flats, small houses and overseas families solarising a parents' home: 12-15 units daily, enough to flatten the base load and pull the bill out of punishing upper slabs.

  • 5-6 large panels, small roof
  • Single-phase connection
  • Lowest route into Tier-1 equipment
View 3KW page
Pakistan's default
5KW System

The most-installed residential size: 20-25 units daily matches the 600-750-unit consumption of a typical family home running an inverter AC through summer.

  • 1-2 inverter ACs + base load
  • On-grid or hybrid choice
  • 2.5-4 year payback with net metering
View 5KW page
Large homes
10KW System

At 40-50 units daily, 10KW covers 1-kanal houses with multiple ACs, or doubles as a small-office system. Benefits from per-watt economies.

  • 3-phase connection
  • ~55-60 m² shadow-free roof
  • Lower cost per KW installed
View 10KW page

Solar Packages by System Type

On-grid, hybrid or off-grid choose by the problem you're solving and your load-shedding reality.

On-Grid Packages

Lowest cost, best ROI, net metering. No battery means less equipment and nothing to replace in five years; surplus exports for credits. Suits areas with stable supply on-grid inverters shut down during load-shedding.

Hybrid Packages

Savings + backup during load-shedding. A hybrid inverter plus lithium battery keeps essentials running through outages while still net-metering. Under net billing, the battery earns its keep twice. The default where outages are routine.

Off-Grid Packages

Full independence with batteries for farmhouses, tube-wells and sites where a grid connection is unavailable. We size conservatively against a measured load list; oversizing an off-grid battery bank is the most expensive mistake in solar.

For most urban homes the real choice is on-grid vs hybrid explore the hybrid system page for backup sizing.

Residential rooftop solar installation by Zynergy

Solar Packages by Sector

The engineering changes with the use case, not just the size. Homes need quiet inverters, clean cable routing and structures that respect the roof you live under. Businesses care about daytime self-consumption shops and offices use power exactly when solar produces, which makes commercial payback often faster than residential.

Industrial packages are designed around 3-phase motor loads and shift patterns, frequently at 100KW+. Agricultural packages replace diesel tube-well pumping, where solar’s daytime generation matches irrigation hours. Whatever the sector, the package principle holds one BOQ, one warranty counterparty, one team accountable from survey through inspection.

Residential Solutions

What's in Every Solar Package (BOQ)

One bill of quantities, no hidden extras every item engineered as a system, not bought piecemeal.

Tier-1 Panels

A-grade with verifiable serials and 25-30 year performance warranties.

Matched Inverter

Sized to your phase and load, slightly under-sized against the array to lift early-morning yield.

Galvanised Structure

Hot-dip, wind-rated elevated frames on RCC lenter, rail mounts on sheet roofs.

DC/AC Protection & Cabling

Breakers, surge arresters, earthing and correctly gauged copper against grid spikes.

Net-Metering Processing

DISCO file, bi-directional meter and inspection liaison included.

Monitoring App + Warranty

Live per-string generation on your phone, plus full warranty documentation.

One engineered system

Why a Package Beats Buying Components Separately

The spreadsheet looks cheaper until the system runs. The package premium buys engineering you cannot bolt on later: an inverter genuinely matched to the array and your phase, cable gauges calculated for your roof-to-meter run (undersized cable silently eats 3-5% of generation), and protections specified as a system.

It also buys one warranty counterparty for the whole installation instead of four vendors pointing at each other when output drops and the net-metering file that self-assembled systems routinely stall on for months. Across 1,000+ installations we’ve repaired enough piecemeal systems to say it plainly: the cheapest route to a working, warrantied, net-metered system is buying it as one engineered package.

Residential rooftop solar installation by Zynergy

Same House, Two Packages

A 10-marla Islamabad home on IESCO uses 700 units a month and sees almost no load-shedding. Option one: a 5KW on-grid package lowest cost, every daytime unit self-consumed or exported, payback at the fast end of 2.5-4 years. Option two: the 5KW hybrid with a lithium battery costs more upfront, payback stretches, but evenings run on stored solar and outages never reach the fridge.

Your load-shedding hours not the salesman should pick your package.

On-grid
Stable feeder → wins on numbers
Hybrid
4-hr cuts → flip without hesitation

Complete Solar System Price How a Package Is Costed

A complete price is built from five blocks. When two quotes for the "same" 5KW system differ widely, line these up the gap is almost always B-grade panels, painted-iron structures or an excluded net-metering file.

Cost blockWhat drives itWhere cheap quotes cut corners
PanelsLargest share, priced per watt, tied to the dollarB-grade / stock-lot substituted for Tier-1
InverterBrand and hybrid-vs-on-grid choiceUnbranded units with no local service
Structure & BOSSteel, cabling, protectionsPainted angle iron, undersized cable, missing surge protection
Battery (if hybrid)Chemistry and usable capacityTubular sold as "lithium-equivalent"
Installation & net meteringLabour + DISCO processingNet-metering file excluded from scope

Our packages price all five blocks in one written BOQ, so the number you sign is the number you pay current rates by size are on the price hub.

After you book

Installed in 7-15 Days

Every package follows the same delivery rhythm: survey and final design first, then structure fabrication and roof work, then panel mounting, wiring and protections, then inverter commissioning and app setup complete in 7-15 days from booking. Net-metering paperwork runs in parallel so the DISCO file is moving while the roof work happens, not after it.

You get a single point of contact through the install, and the system is handed over generating, with the monitoring app on your phone and warranty documents in your hand. It’s the process refined across 1,000+ projects since 2021 and the reason our customers rate us 4.9★ across 100+ reviews.

Not Sure What Size You Need?

Run this five-minute checklist before you call anyone or use the Load Calculator.

  • Pull 12 months of bills size to your summer peak months, not a mild February.
  • Count your ACs each 1.5-ton inverter AC adds roughly 1.5KW of daytime design load.
  • Check your phase single-phase caps you around 5KW; 3-phase opens everything above it.
  • Measure shadow-free roof about 5-6 m² per KW on an RCC lenter with elevated structure.
  • Note your load-shedding hours zero-to-rare means on-grid; daily outages mean hybrid.
  • Confirm sanctioned load net metering is capped at it; extensions are possible but take time.
Pay monthly

Any Package, on Installments

For many 5-10KW homes the monthly instalment is lower than the bill it replaces and the instalment ends, while bills never do. As one of Meezan Bank’s Top-3 approved solar vendors, Shariah-compliant Islamic financing is available with straightforward documentation, alongside conventional bank options.

Meezan Bank Top-3 Approved solar vendor

Solar Package FAQs

Everything: Tier-1 panels, inverter, galvanised structure, protections, cabling, installation, net-metering processing, monitoring app and warranties one BOQ, no hidden extras.

Most Pakistani homes land between 5KW and 10KW. Divide your monthly units by 30, then by 4-5, and you have your KW figure or use the Load Calculator.

It depends on on-grid vs hybrid and inverter brand current rates are on the price hub. Per-watt rates move with the dollar, so check the quote date.

Yes on-grid and hybrid packages include the complete DISCO application, bi-directional meter processing and inspection liaison as standard.

7-15 days from booking to a commissioned, generating system. Net-metering approval continues in parallel through your DISCO.

In daytime, yes an inverter AC drawing 1.2-1.8KW fits within 3KW generation, but it leaves little headroom for the rest of the house. Families that run AC daily are better served at 5KW.

On-grid if your area has stable supply (lowest cost, fastest payback); hybrid if load-shedding is part of your week. The battery adds cost but buys backup and evening self-consumption.

Yes 15KW to 1MW for offices, schools, factories and farms, each designed against your measured load profile and sanctioned-load position rather than a standard kit.

25-30 year panel performance, 10-12 year panel product, 5-10 year inverter (brand-dependent), battery warranty per chemistry, plus our workmanship cover all serviceable in Pakistan.

Yes financing options include Islamic financing through Meezan Bank, where Zynergy is one of the Top-3 approved solar vendors. The EMI is often lower than the bill the system replaces.

Tell us your bill

We'll tell you your package.

One free survey, one itemised BOQ, one team from survey to switch-on installed in 7-15 days with net metering handled.